Areas of Designing:- Architectural
- Structural (for buildings only)
- Assessment of price for construction
- Economic
Construction work involves:
- General construction work, except laying asphalt
- Water-supply and sewage systems inside and outside the buildings
- Heat production (up to 1 MW) and supply
- Applying heat insulation for buildings
- Ventilation
- Electrotechnical work up to the voltage of 1000 V
- Telecommunications
- Security and fire alarm systems
- Maintenance of cultural heritage objects